Welcome to Greatoo Intelligent Equipment Inc.
新澳门原料网1688茄子

News

The current position:  

News>Company News

The first phase of the Wheel Intelligent (Sino-German) Industrial 4.0 industrial base was successfully completed

Createtime:2017-05-21

新澳门原料网1688茄子


After nearly 8 months of hard constructionIn,in May 20, 2017,the first phase of the project, the wheel of intelligent (Sino-German) industrial 4.0 industrial base,has been basically completed.The project covers the high-rise industrial buildings, involving nearly two hundred acres of hillside, moving the earth 100,000 square meters, with a total construction area of nearly 60,000 square meters, has completed the door, road network, power supply, water supply, fire, air conditioning, green and other supporting projects , and a modern industrial plant has risen in Jieyang city.In this construction process, the workers paid a lot of efforts to make the project,so tit can be successfully completed, what’s more,it mainly benefit from the following aspects:Firstly, the company's board of directors has a very good decision-making ability and leadership art. Such as the establishment of a strong body, the appointment of appropriate candidates, to give a number of policy support, in the important node to crack the difficulties, which is the fundamental guarantee for the success of the project.Secondly, the construction of the leading group has excellent command and coordination capabilities, to maintain adequate logistical support, to solve the problem with a strong response, and the method is effective.Such as last year, concrete supply for some reason, and the leading group to fully support the solution to the problem.As we all know,they are the strong support for the implementation of the project.Thirdly, the engineering department demonstrated a powerful execution force. They are going to carry out the work foreseeably, with the target slogan, flapping their posts and grasping the project. They dare to make the progress of the project a strong promoter, and even wear helmets in the field as construction workers.Fourthly, the contractors show a tenacious fighting spirit. The contractors all costs to configure the construction resources, obey orders and listen to the command, organize carefully, they often live and have meals in the building site,and highly cooperate with the Greatoo's efficient style.

The above four parties form a good interaction and cooperation, united around the board, accumulating a strong positive energy.Not only many personnel working in the front line, and even a lot of staffs have made effortsbehind the scenes, such as a variety of equipment, material suppliers, although they did not come to the scene, but also make efforts to catch equipment and materials working day and nightovertime for the company , to provide us with variousreliableproducts and materials, so that the project can be implemented.We take practical action to reflect the "family, a heart, a strength, a goal" concept, while there is no accident in the whole process of construction.We closely monitor the individual projects to ensure that the quality of work is not affected by the time, so that the project quality isup to the standards.The first phase of the project will also be due to short duration, good quality, moderate cost, high grade, rich cultural content and load the history of the Greatoo.After the completion of the project, the production department immediately entered the equipment removal and commissioning stage, the scene is a bustling scene, for the completion of production in a short time.As we all know,the successful completion of the first phase of the industrial base will lay a solid foundation for further development of strategic development space and promote the development of intelligent equipment.
Back新澳门原料网1688茄子